Index
Concepts, frameworks, and metrics, each pointing to the topics where they appear. Numbers are topic numbers; titles are in the table of contents of the README and in structure. For short definitions with a home topic, see topic 12.1, Glossary.
Frameworks and models
- Balanced scorecard: 1.7
- DevEx: 9.1
- DORA: 1.1, 1.3, 1.5, 2.0, 2.1, 2.2, 2.4, 2.7, 2.8, 3.3, 3.4, 3.7, and others
- FinOps: 5.4, 7.0, 7.5, 7.6, 7.7
- Four Keys: 2.8
- Goal-Question-Metric: 1.0, 1.7
- GQM: 1.7
- ISO/IEC 20000: 1.4
- ISO/IEC 27001: 8.1, 8.3
- ITIL: 1.0, 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 2.0, 2.1, 2.2, 2.3, and others
- Kanban Guide: 1.6, 2.1, 2.2, 2.5
- Lean: 2.2, 2.3, 2.4
- NIST: 10.5
- OKR: 1.7
- Site reliability: 1.1, 5.0, 5.1, 5.4, 5.5
- SPACE: 1.1, 9.1
Metrics
Metric names as they appear in each topic's definitions table. The full entries are in appendix 12.2 (see topic 12.2, Metric definitions and formulas reference).
- Abandonment rate: 3.1
- Access review currency: 1.4
- Accessibility request resolution time: 6.4
- Action closure rate: 4.2
- Action follow-through rate: 9.5
- Action item follow-through: 3.4
- Actionable alert rate: 5.5
- Active use rate: 6.3
- Active-time share: 3.3
- Adoption rate: 6.3
- Age profile: 7.3
- Agent action reversal rate: 10.3
- Agreement coverage and currency: 5.1
- AI incident rate and time to contain: 10.5
- AI use coverage: 10.1
- AI use register coverage: 10.5
- Aim clarity: 9.6
- Alert concentration: 5.5
- Alert rule currency: 5.5
- Alert volume: 5.5
- Allocation coverage: 7.5, 7.6
- Anomaly acknowledgement time: 7.6
- Answer accuracy: 10.3
- Approval lead time: 4.3
- Approval queue age: 4.3
- Approval wait time: 3.5
- Arrival and departure rate: 2.3
- Article freshness: 3.6
- Assessment burden: 11.4
- Assessment participation: 11.4
- Assisted support quality: 10.2
- Audience reach (descriptive): 11.1
- Audit effort: 8.3
- Automated approval share: 4.3
- Automation coverage: 3.7
- Automation failure and rework rate: 3.7
- Automation share: 3.5
- Backdating rate: 1.5
- Backlog age: 2.6
- Backlog discard rate: 2.6
- Backlog inflow against resolution: 10.4
- Backlog inflow-outflow ratio: 2.6
- Backlog size: 2.6
- Backup restore success rate: 5.6
- Baseline completeness: 10.1
- Baseline coverage: 1.1, 11.5
- Benefit estimate accuracy: 7.7
- Benefit realization rate: 6.5
- Benefit review completion rate: 1.3
- Blocked time share: 2.1
- Bot satisfaction and effort: 10.3
- Budget policy adherence: 5.2
- Burn rate: 5.2
- Business-impact hours: 6.5
- Candour signal: 11.3
- Capacity allocation: 2.5
- Capacity allocation adherence: 2.9
- Capacity lead time: 5.4
- Catalogue coverage: 6.3
- Category concentration: 3.2
- Cause recurrence rate: 4.2
- CES: 6.1
- Challenge turnaround: 11.3
- Change control coverage: 10.5
- Change fail rate: 2.8, 4.4
- Change lead time: 2.8
- Change load: 9.6
- Change record completeness: 4.3
- Change volume by type: 4.3
- Change-to-incident link rate: 4.4
- CI accuracy: 7.4
- CI completeness: 7.4
- Clock pause share: 2.2, 5.1
- Cloud unit cost: 7.6
- CMDB use rate: 7.4
- Cognitive load rating: 9.1
- Collaborative resolution rate: 9.3
- Comment theme share: 6.1
- Commitment coverage: 7.6
- Commitment utilization: 7.6
- Communication timeliness: 3.4
- Community participation: 9.4
- Concentration: 8.4
- Contact rate: 3.1
- Contact volume: 3.1
- Content redundancy rate: 10.4
- Contract register coverage: 8.4
- Contribution breadth: 3.6
- Control chart signal rate: 1.6
- Control effectiveness rate: 8.2
- Control test coverage: 8.2
- Cost estimate accuracy: 7.7
- Cost per AI-assisted task: 10.1
- Cost per service: 7.5
- Cross-training depth: 9.4
- CSAT: 6.1
- CSF-to-KPI coverage: 1.7
- Customer impact: 3.4
- Cycle time: 2.1, 2.2
- Data age at review: 1.1
- Data freshness: 1.5, 11.1
- Day-one readiness rate: 6.4
- Days since last successful recovery test: 5.6
- Debt capacity share: 4.6
- Debt interest: 4.6
- Debt net change: 4.6
- Debt stock: 4.6
- Decision evidence: 11.4
- Decision linkage: 1.4, 11.1
- Decision-linked metric share: 1.1
- Definition alignment: 8.5
- Definition and data trust: 11.4
- Definition change count: 1.2
- Definition completeness: 11.1
- Definition currency: 1.4
- Degradation share: 5.3
- Delivery goal success: 2.5
- Dependency coverage: 7.4
- Dependency delay: 9.3
- Deployment frequency: 2.8, 4.5
- Deployment rework rate: 2.8, 4.4
- Deployment-to-release gap: 4.5
- Detection coverage: 5.5
- Detractor follow-up time: 6.1
- Dimension coverage: 9.1
- Discovery coverage: 7.1
- Display size: 11.1
- Due diligence currency: 8.4
- Duplicate CI rate: 7.4
- Effect check rate: 9.5
- Effective licence position: 7.2
- Emergency change share: 4.4
- Error budget remaining: 5.2
- Escaped defect rate: 10.2
- Estimated deflection rate: 3.7
- Evaluation currency: 10.5
- Evidence automation rate: 8.3
- Evidence quality share: 6.5
- Evidence turnaround: 8.3
- Evidence-based stop rate: 7.7
- Exercise finding closure rate: 5.6
- Exit readiness: 8.4, 11.2
- Expedite rate: 2.9
- Experience gap: 6.2
- Experience score: 6.2
- Experience score by journey: 5.1
- Explanation check pass rate: 10.2
- Exposure window: 8.1
- Failed deployment recovery time: 2.8
- Failure rate by model: 7.3
- Failure-definition agreement: 4.4
- Fall-through rate: 3.7
- False positive rate: 5.5
- Feature adoption rate: 1.3
- Feature flag coverage: 4.5
- Feedback loop time: 9.1
- Finding closure time: 8.3
- First contact resolution rate: 3.1
- Flow efficiency: 2.2
- Focus time share: 9.1
- Forced-disruption minutes: 6.4
- Forecast error: 5.4
- Forecast hit rate: 2.5
- Forecast range width: 2.5
- Forecast variance: 7.5, 7.6
- Friction events per user: 6.2
- Frontline idea share: 9.5
- Fulfilment within target: 3.5
- Goal traceability: 1.7
- Guardrail coverage: 1.2
- Hand-off wait time (85th percentile): 5.1
- Handle time: 3.1
- Handoff context completeness: 10.3
- Handoff count: 2.4, 9.3
- Handoff wait share: 9.3
- Headroom: 5.4
- Helpfulness rate: 3.6
- High-percentile resolution time: 1.6
- Hotfix rate: 4.4
- Human oversight evidence rate: 10.5
- Hypothesis check rate: 6.5
- Idle device share: 7.3
- Impact prediction hit rate: 7.4
- Improvement actions from assessments: 11.4
- Improvement backlog age: 9.5
- Improvement capacity share: 9.5
- Improvement follow-through: 1.1
- Improvements traced to measures: 11.5
- Incident volume by service: 3.2
- Incident-to-problem link rate: 4.1
- Incidents linked to open known errors: 4.6
- Indicator review age: 1.7
- Individual-use incidents: 11.3
- Interrupt rate: 2.9
- Interval width: 1.6
- Inventory accuracy: 7.1
- Joint action closure rate: 8.4
- Journey completion rate: 6.2
- Key result score distribution: 1.7
- Knowledge coverage: 9.3
- Knowledge link rate: 3.6
- Known error backlog age: 4.6
- Known error reuse rate: 4.1
- KRI breach response time: 8.2
- Latency percentile: 5.4
- Lead time: 2.2
- Leading indicator validation rate: 1.3
- Learning reach: 4.2
- Lessons shared across teams: 9.4
- Level distribution (shift-left share): 3.7
- Licence utilization rate: 7.2
- Lifecycle stage completeness: 7.1
- Little's law consistency ratio: 2.3
- Local velocity: 2.5
- Major incident count: 3.4
- Major incident duration: 3.4
- Manual effort share: 11.2
- Manual touch time per request type: 3.7
- Measurement coverage: 5.3
- Measurement effort: 1.1
- Median resolution time: 1.6
- Metric drift flags: 10.4
- Metric use rate: 1.2
- Monitored detection share: 5.5
- Monitoring-detected share: 3.2
- Near-miss reporting rate: 4.2
- Near-miss share: 5.1
- Needs-support rating: 9.2
- Net present value: 7.7
- Night interruption rate: 5.7
- Normalized incident rate: 3.2
- NPS: 6.1
- Obligation coverage: 8.3
- Obstacle resolution time: 9.1
- OLA attainment rate: 5.1
- Oldest open incident age: 3.3
- Oldest open item age: 1.6
- Open action age: 4.2
- Open-source review coverage: 7.2
- Out-of-hours page share: 5.7
- Outage frequency and spacing: 5.3
- Outcome coverage: 1.3
- Outcome indicator movement: 6.5
- Outcome movement against comparison: 9.6, 10.1
- Outcome-linked capacity share: 6.5
- Output-to-outcome ratio: 10.4
- Overdue critical findings: 8.1
- Owner coverage: 8.2
- Ownerless asset share: 7.1
- Ownership coverage: 1.4
- Pages per shift: 5.7
- Patch compliance: 8.1
- Payback period: 7.7
- Perceived safety of measurement (survey): 11.3
- Percent complete and accurate (stage): 2.4
- Perception gap: 1.2
- Performance test coverage: 5.4
- Persistent-team funding share: 7.5
- Perspective coverage: 1.7
- Pipeline reliability: 11.2
- Plan currency: 5.6
- Planned commitment reliability: 2.9
- Planned downtime share: 5.3
- Planned work displacement: 2.9
- Post-fix recurrence rate: 4.1
- Post-merge fix rate: 2.7
- Post-merge rework: 10.2
- Practice adoption breadth: 9.6
- Priority mix: 3.2
- Priority reclassification rate: 3.2
- Privacy safeguard compliance: 6.4
- Problem backlog age: 4.1
- Problems opened and closed: 4.1
- Process efficiency: 2.4
- Process time: 2.4
- Profile by dimension: 11.4
- Programme effort share: 11.5
- Protected learning time share: 9.4
- Psychological safety rating: 9.2
- Published accessibility conformance: 8.5
- Pull request size: 2.7
- Question coverage: 11.1
- Queue length: 2.3
- Queue time: 2.3
- Rate reporting coverage: 1.6
- Ready work depth: 2.6
- Reassignment count: 3.3
- Reassignment rate: 9.3
- Reconciliation rate: 7.1, 11.2
- Reconciliation variance: 1.5
- Recontact rate: 3.1
- Refinement coverage: 2.6
- Refresh on-time rate: 7.3
- Release batch size: 4.5
- Release frequency: 4.5
- Release lead time: 4.5
- Relevant certification coverage: 9.4
- Renewal readiness: 7.2
- Reopen rate: 1.2, 3.2
- Repeat contact rate: 1.3
- Repeat finding rate: 8.3
- Repeat incident rate: 3.2
- Repeat issue rate: 9.5
- Repeat major incident rate: 3.4
- Repeat page rate: 5.7
- Repeat unplanned work share: 2.9
- Replacement lead time: 7.3
- Report timeliness: 8.5
- Reporting effort: 8.5
- Reporting obligation coverage: 8.5
- Request abandonment rate: 6.3
- Request backlog and age: 3.5
- Request concentration: 6.3
- Request fulfilment time: 3.5
- Request reopen rate: 3.5
- Request volume by catalogue item: 3.5
- Request-based availability: 5.3
- Resource utilization: 5.4
- Respondent coverage: 6.1
- Restatement rate: 8.5
- Retention rate: 10.2
- Retired measures and reports: 11.5
- Retirement rate: 1.4, 11.1
- Retrospective action carry-over: 4.2
- Return contact rate: 10.3
- Return on investment: 7.7
- Reuse and recycling rate: 7.3
- Reuse ratio: 3.6
- Reversion rate: 9.6
- Review completion timeliness: 3.4
- Review coverage: 4.2
- Review cycle time: 2.7
- Review load: 10.2
- Review load concentration: 2.7
- Review quality score: 4.2
- Review rounds: 2.7
- Reviewed output accuracy: 10.1
- Reviewed share of generated knowledge: 10.4
- Risk assessment currency: 10.5
- Risk exception age: 8.1
- Risk review currency: 8.2
- Risk-based change share: 8.2
- Rollback rate: 4.4
- Rolled percent complete and accurate: 2.4
- Rotation depth: 5.7
- RPO met rate: 5.6
- RTO met rate: 5.6
- Run, change, and improvement split: 7.5
- Safe-to-speak pulse: 4.2
- Saturation: 5.4
- SBOM coverage: 7.2
- Scan coverage: 8.1
- Scope change rate: 2.5
- Search success rate: 6.3
- Secure disposal completion: 7.3
- Security report rate: 8.1
- Segregation-of-duties conflicts: 8.3
- Self-service adoption (portal-first share): 3.7
- Self-service success rate: 3.7
- Sentiment trend: 6.2
- Service backlog past target: 2.6
- Shelfware cost: 7.2
- Showback dispute rate: 7.5
- SLA attainment rate: 5.1
- SLE attainment: 2.1
- SLI attainment: 5.2
- SLO compliance: 5.2
- SLO coverage: 5.2
- Source conformance: 1.4
- Source coverage: 1.5, 11.2
- Stage review completion: 11.5
- Stakeholder involvement rate: 9.6
- Stakeholder response time: 9.3
- Stale flag count: 4.5
- Stale item share: 6.3
- Stale pull request count: 2.7
- Standard change share: 4.3
- Status model drift: 1.5
- Suggestion acceptance and override rate: 10.1
- Supplier AI due diligence currency: 10.5
- Supplier service level attainment: 8.4
- Supplier-attributed incident time: 8.4
- Survey response rate: 1.5, 6.1
- Sustainable pace rating: 9.2
- Sustained extended-hours weeks: 9.2
- Takt time ratio: 2.4
- Task time against baseline: 10.1
- Team health check trend: 9.1
- Team load ratio: 2.3
- Team ownership share: 11.3
- Teams actively using measures: 11.5
- Tested recovery coverage: 5.6
- Throughput: 2.1
- Throughput stability: 2.5
- Time from idea to trial: 9.5
- Time lost to IT issues: 6.2
- Time to a new measure: 11.2
- Time to acknowledge: 3.3
- Time to act on well-being feedback: 9.2
- Time to answer: 3.1
- Time to contain: 8.1
- Time to declare: 3.4
- Time to detect: 3.3
- Time to detect (TTD): 5.5
- Time to first contribution: 9.4
- Time to first response: 3.3
- Time to first review: 2.7
- Time to first useful result: 11.5
- Time to first value: 6.5
- Time to human: 10.3
- Time to permanent fix: 4.1
- Time to productive: 6.4
- Time to publish: 3.6
- Time to record: 7.1
- Time to resolve: 3.3
- Time to restore: 3.3
- Time to root cause: 4.1
- Time-based availability: 5.3
- Time-to-next-level (descriptive): 11.4
- Timestamp completeness: 1.5
- Toil by source: 5.7
- Toil removed: 5.7
- Toil share of time: 5.7
- Tool and process satisfaction: 9.1
- Tool pulse score: 6.4
- Tooling cost per team supported: 11.2
- Total cost of ownership: 7.7
- Touch time: 2.2
- Traceability coverage: 8.5
- Training application rate: 9.4
- Treatment plan timeliness: 8.2
- Unaccounted asset rate: 7.1
- Unaided confidence rating: 10.2
- Unit cost: 7.5
- Unplanned downtime: 5.3
- Unplanned work ratio: 2.9
- Unsanctioned application count: 7.2
- Update latency: 7.4
- Use charter coverage: 11.3
- Useful-item share: 10.4
- User-weighted availability: 5.3
- Value stream lead time: 2.4
- Verification burden: 10.4
- Verified resolution rate: 10.3
- Voluntary adoption: 11.3
- Voluntary attrition and exit themes: 9.2
- Voluntary uptake share: 9.6
- Wait time: 2.2, 2.4
- Waste rate: 7.6
- Watermelon gap: 5.1
- WIP limit breach rate: 2.3
- Work in process: 2.3
- Work in progress (WIP): 2.1
- Work item age: 2.1
- Workaround coverage: 4.6
- Workaround prevalence: 6.4
- Workaround-only share: 4.1
- Workload strain rating: 9.2
- XLA attainment: 6.2
- Zero-result search rate: 3.6
Concepts
Concepts are drawn from the terms that topics link to Wikipedia for background. The first number is usually the topic that explains the concept in the most detail.
- A/B testing: 6.5
- Accelerate: 2.8
- Accountability: 8.5
- Activity-based costing: 7.5
- agile: 3.4, 4.2
- Agile software development: 1.1, 1.3
- AI slop: 10.4
- AIOps: 10.1
- Alarm fatigue: 5.5, 5.7
- Alert fatigue: 10.4
- Algorithmic bias: 10.5
- Anomaly detection: 7.6
- application programming interface: 11.2
- Artificial intelligence: 10.1
- Artificial Intelligence Act: 10.5
- Asset tracking: 7.1
- attack surface: 8.1
- audit trail: 4.3, 8.3, 10.5
- automated decision-making: 10.3
- automatic call distributor: 3.1
- Automation: 3.7
- automation bias: 10.1
- Autoscaling: 5.4, 7.6
- Availability: 5.2
- backlog: 4.1
- balanced scorecard: 1.3, 1.7, 11.1
- Benefits realization management: 6.5
- black swan theory: 8.2
- blue-green deployment: 4.5
- bottleneck: 2.3, 9.3
- Brandolini's law: 10.4
- Brooks's law: 9.3
- bus factor: 3.6, 9.3
- business case: 7.7
- Business continuity planning: 5.6
- business impact analysis: 5.6
- call centre: 3.1
- Campbell's law: 1.2, 10.4, 11.3
- canary release: 2.8, 4.4, 4.5
- canary releases: 5.2
- Capability Maturity Model: 11.4
- Capacity planning: 2.5, 5.4
- Capital expenditure: 7.5
- carbon footprint: 7.6
- cargo cult: 9.6
- Cargo cult programming: 9.6
- chain of custody: 7.1
- change fatigue: 9.6
- change management: 4.3, 9.6, 11.3, 11.5
- Chaos engineering: 5.6
- Chartjunk: 11.1
- chatbot: 3.7, 10.3
- CI/CD: 2.8
- circular economy: 7.3
- class of service: 2.9
- Cloud computing: 7.6
- co-created: 1.3
- cobra effect: 1.2
- Code refactoring: 4.6
- code review: 2.7, 4.3, 10.2
- code smell: 4.6
- cognitive load: 6.4, 9.1
- cognitive offloading: 10.2
- cohort analysis: 6.3
- Common Vulnerabilities and Exposures: 8.1
- Common Vulnerability Scoring System: 8.1
- community of practice: 9.4
- Computer security incident management: 8.1
- concept drift: 10.4
- cone of uncertainty: 2.5
- confidence interval: 1.6, 6.1
- configuration item: 7.4
- configuration management database: 7.4
- configuration management database (CMDB): 1.5
- confounding: 6.5
- Continual improvement: 1.4
- continual improvement process: 9.5, 11.4
- Continuous auditing: 8.3
- continuous delivery: 2.8, 4.4, 4.5
- continuous integration: 2.7
- continuous integration and continuous delivery (CI/CD): 1.5
- control chart: 1.6, 2.1, 3.2, 11.1
- conversion funnel: 6.3
- Conway's law: 9.3
- Coordinated Universal Time (UTC): 1.5
- copyleft: 7.2
- Cost accounting: 7.5
- Cost allocation: 7.5
- cost driver: 7.5
- cost of delay: 2.9, 4.6
- critical success factor: 1.7
- Cross-functional teams: 9.3
- Cross-training: 9.4
- cumulative flow diagram: 2.1, 2.3
- customer experience: 6.2
- customer satisfaction: 3.1, 6.1
- Cycle time: 2.2
- dark pattern: 10.3
- dark patterns: 6.3
- dashboard: 11.1
- data dictionary: 1.4
- data erasure: 7.3
- data governance: 1.4, 11.2
- data integrity: 7.4
- data minimization: 6.4
- data pipeline: 11.2
- data quality: 7.1, 11.2, 11.5
- data steward: 1.4
- Data visualization: 11.1
- data warehouse: 11.2
- dependency: 9.3
- Depreciation: 7.3
- deskilling: 10.2
- Developer experience: 9.1
- DevOps: 1.1
- DevOps Research and Assessment (DORA): 2.8
- DevSecOps: 8.1
- difference-in-differences: 6.5
- diffusion of innovations: 6.3, 9.6
- digital workplace: 6.4
- Double-loop learning: 9.5
- Downtime: 5.3
- duplicate code: 10.2
- economic indicator: 1.3
- economies of scale: 7.5
- Electronic waste: 7.3
- employee engagement: 9.2
- Employee experience: 6.4
- Employee monitoring: 6.4
- entity resolution: 7.4
- exit strategy: 8.4
- extract, transform, load: 11.2
- extract, transform, load (ETL): 1.5
- failure rate: 7.3
- false positives and false negatives: 5.5
- feature toggle: 4.4, 4.5
- feature toggles: 2.8, 5.2
- first-call resolution: 3.1
- five whys: 4.1, 4.2
- fixed assets: 7.1
- fixed cost: 7.5
- flow: 6.4
- Flow state: 9.1
- forecasting: 2.5, 5.4
- freedom of information laws: 8.5
- General Data Protection Regulation: 8.3
- generative AI: 10.1
- Goodhart's law: 1.1, 1.2, 2.5, 2.7, 2.8, 3.5, 4.3, 4.4, 4.5, 6.1, 6.2, 6.3, 6.4, 6.5, 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 8.1, 8.2, 8.3, 8.4, 8.5, 9.1, 9.2, 9.3, 9.4, 9.5, 9.6, 10.1, 10.2, 10.3, 10.4, 10.5, 11.1, 11.3
- graph database: 7.4
- hallucination: 10.1
- Hawthorne effect: 9.6, 11.3
- help desk: 3.1
- high availability: 5.3
- Hindsight bias: 4.2
- hotfix: 4.4
- human-centred design: 6.2
- Human-in-the-loop: 10.1
- incident commander: 3.4
- Incident management: 3.2, 3.3, 3.4, 5.7
- Information overload: 10.4
- information radiator: 11.3, 11.5
- Information technology audit: 8.3
- infrastructure as code: 3.7, 4.3, 5.6, 7.4
- intelligent agent: 10.3
- internal audit: 8.3
- internal control: 8.2
- intrinsic motivation: 9.2
- Inventory management: 7.1
- Ishikawa diagram: 4.1
- ISO 22301: 5.6
- ISO/IEC 27001: 8.3
- issue tracking system: 1.5, 2.6
- IT asset management: 7.1
- IT service management: 1.1, 11.2
- IT service management (ITSM): 1.5, 3.1
- ITIL: 1.1, 1.2, 1.3, 1.5, 1.7, 2.4, 2.6, 2.8, 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 4.1, 4.2, 4.3, 4.4, 4.6, 5.3
- Jevons paradox: 10.4
- Job satisfaction: 9.2
- just culture: 4.2
- k-anonymity: 6.4
- Kaizen: 9.5, 11.4, 11.5
- key performance indicator: 1.2, 1.7, 11.1
- key risk indicator: 8.2
- Kingman's formula: 2.3
- knowledge base: 3.6
- Knowledge management: 3.6
- Knowledge-Centred Service (KCS): 3.6
- known error database: 4.1
- lagging indicator: 6.5
- large language models: 10.1
- Latency: 5.4
- law named after Charles Goodhart: 3.4
- Lead time: 2.2, 2.4
- leading indicator: 6.5
- lean manufacturing: 2.4, 9.5
- lean software development: 2.1, 2.2, 2.3
- learning organization: 9.4
- Likert scale: 6.1
- Lines of code: 10.2
- Little's law: 2.1, 2.2, 2.3, 2.4, 2.6, 2.9, 5.4
- load testing: 5.4
- log-normal distribution: 1.6, 3.3
- logic model: 6.5
- machine learning: 10.1
- margin of error: 6.1
- Mean time between failures: 5.3, 7.3
- mean time to repair: 5.3
- median: 1.6, 3.3
- Mentorship: 9.4
- minimum viable product: 11.5
- Mobile device management: 7.3
- model collapse: 10.4
- Monte Carlo method: 2.5
- multisourcing: 8.4
- Net present value: 7.7
- net promoter score: 6.1
- objectives and key results: 1.3, 1.7, 6.5
- observability: 1.5, 11.2
- Occupational burnout: 5.7, 9.2
- on-call: 5.5, 5.7
- open data: 8.5
- Open government: 8.5
- Open-source software: 7.2
- operational level agreement (OLA): 5.1
- Opportunity cost: 4.6, 7.7
- Optimism bias: 7.7
- organizational change: 9.6
- Organizational culture: 9.6
- Outsourcing: 8.4
- Pair programming: 2.7, 9.4
- Pareto chart: 4.1, 5.7
- Pareto principle: 3.2, 6.3
- pay-as-you-go: 7.6
- payback period: 7.7
- percentile: 1.6, 2.1, 2.2, 2.6, 3.1, 3.4, 3.5, 5.1, 5.4
- percentiles: 3.3, 5.2
- performance audits: 8.5
- Performance-based contracting: 8.4
- perverse incentive: 1.2
- pilot project: 9.6, 11.3, 11.5
- Plan-Do-Check-Act: 9.5
- planning fallacy: 2.5
- postmortem: 3.4, 4.2
- precision and recall: 5.5
- principle of least privilege: 1.4
- process automation: 3.5
- product backlog: 2.6, 6.3
- Product lifecycle: 7.1
- productivity: 9.1
- professional certification: 9.4
- Prompt injection: 10.5
- pseudonymization: 6.4
- Psychological safety: 1.2, 4.2, 9.1, 9.2, 11.3
- Public procurement: 8.5
- public sector: 8.5
- pull request: 2.7
- pull requests: 10.2
- queueing theory: 2.1, 2.3, 3.1, 5.4
- RACI matrix: 1.4
- Real user monitoring: 5.3, 6.2
- reconciliation: 7.1
- records management: 8.5
- recovery point objective: 5.6
- recovery time objective: 5.6
- reference class forecasting: 7.7
- regression testing: 4.4, 10.2
- regression toward the mean: 1.6
- regulation of artificial intelligence: 10.5
- Regulatory compliance: 8.3
- release management: 4.5
- Resistance to change: 9.6
- response bias: 6.1
- responsible AI: 10.5
- return on investment: 1.1, 7.7
- Rework: 4.4
- Risk management: 8.2
- risk matrix: 8.2
- risk register: 8.2
- roll back: 2.8
- rollback: 4.4
- rolled throughput yield: 2.4
- root cause: 3.4
- root cause analysis: 3.2, 4.1, 4.2, 4.6, 9.5
- run chart: 2.1, 11.1, 11.5
- runbook: 3.6, 3.7
- Sarbanes–Oxley Act: 8.3
- seasonality: 3.2, 5.4
- segregation of duties: 8.3
- selection bias: 1.5
- Self-determination theory: 9.2
- Self-service: 3.7, 10.3
- sensitivity analysis: 7.7
- Sentiment analysis: 6.2
- separation of duties: 4.3
- Serverless computing: 7.6
- service catalogue: 3.5, 6.3
- service desk: 3.2, 3.6
- service discovery: 7.4
- service integration and management: 8.4
- service level agreement: 2.1, 5.3
- service level agreement (SLA): 5.1, 5.2
- service level indicator (SLI): 5.1, 5.2
- service level management: 5.1
- service level objective: 5.3
- service level objective (SLO): 5.1, 5.2, 5.5
- service-dominant logic: 1.3
- service-level agreement: 2.9, 3.3, 6.2, 8.4
- service-level agreement (SLA): 3.1, 3.5
- Shadow IT: 6.4, 7.2, 10.5
- signal-to-noise ratio: 5.5, 10.4
- single source of truth: 1.4
- Site reliability engineering: 1.1, 3.3, 5.6, 5.7
- site reliability engineering (SRE): 3.4, 4.2, 5.1, 5.2, 5.4, 5.5
- skewed: 1.6
- Sleep deprivation: 5.7
- SOC 2: 8.3
- social desirability bias: 9.2
- Software as a service: 7.2
- Software asset management: 7.2
- software audit: 7.2
- software bill of materials: 7.2
- software bug: 4.6
- Software composition analysis: 7.2
- software deployment: 4.5
- software licence: 7.2
- software supply chain: 8.1
- software testing: 10.2
- sparkline: 11.1
- Static programme analysis: 2.7, 4.6
- statistical process control: 1.6
- story points: 2.5
- strategy map: 1.7
- sunk cost: 7.7
- supply chain attack: 8.4
- Surrogation: 1.2
- survey methodology: 6.1
- Survivorship bias: 6.5
- Synthetic monitoring: 5.3
- System monitoring: 5.5
- T-shaped skills: 9.4
- tacit: 9.4
- tacit knowledge: 3.6
- Tail latency: 5.4
- task switching: 2.9
- technical debt: 2.9, 4.1, 4.6, 10.2
- technology adoption life cycle: 11.3
- theory of change: 6.5
- theory of constraints: 2.3, 2.4, 9.5
- Throughput: 5.4
- time value of money: 7.7
- total cost of ownership: 7.3, 7.7, 11.2
- triage: 2.9
- trunk-based development: 2.7
- Trust: 11.3
- unit cost: 7.5
- Usability: 6.2
- User experience: 6.2
- user story: 2.6
- Value for money: 8.5
- value stream: 2.4
- Value-stream mapping: 2.4
- vanity metric: 1.3, 10.4, 11.1, 11.4
- vanity metrics: 1.7
- variable cost: 7.5
- variance analysis: 7.6
- Velocity: 1.2, 2.5
- Vendor lock-in: 7.2, 8.4, 11.2
- Vendor management: 8.4
- Version control: 1.5, 2.7
- Victor Basili: 1.7
- virtual assistant: 10.3
- volume discount: 7.6
- vulnerability: 8.1
- Ward Cunningham: 4.6
- warranty: 7.3
- Web accessibility: 6.4
- Web analytics: 6.3
- Wikipedia article on mean time to repair: 3.3
- work in process: 2.3
- workaround: 4.1