Three checklists for the program team: one for reviewing a single metric, one for launching a dashboard, and one for auditing a metrics program. Use them as prompts for a conversation with the teams, not as a form to be filled in and filed. Tailor them, and drop items that do not fit your context.

Metric review checklist

Use this before a metric is adopted and at each periodic review (see topic 1.4, Metrics governance and ownership).

Purpose

  • The metric answers a question that a named audience asked.
  • The decision it should inform is written down.
  • It measures an outcome, or it is clearly paired with one (see topic 1.3, Outcomes over output: choosing what to measure).

Definition

  • A written definition, formula, unit, and data source exist.
  • The clock or boundary rules are explicit (when counting starts, stops, and pauses).
  • An owner is named, and a person to ask when the number looks wrong.
  • Known limits of the data are recorded, including gaps and changes in how it was entered.

Honesty

  • The most likely gaming vector is written down.
  • A paired guardrail metric or practice is in place.
  • The metric describes a team, service, or system, and never ranks individuals.
  • Time measures show a median and a high percentile, with the sample size (see topic 1.6, Statistical literacy for service metrics).
  • A baseline of several periods exists, so changes can be read against ordinary variation.

Use

  • The team that does the work sees the number first and helped to define it.
  • The last review led to a recorded decision, including a decision to wait.
  • A condition for retiring the metric is written down.

Dashboard launch checklist

Use this before a dashboard is shown to its audience (see topic 11.1, Designing a service metrics dashboard).

Audience and content

  • The audience and its questions are written down, and the audience helped to review a sketch.
  • The view has no more than about nine measures, with detail one step down.
  • The set is balanced across flow, quality, reliability, experience, and cost.
  • Every measure has a companion that guards against its likely distortion.

Clarity

  • Every value shows trend and context, with events noted.
  • Every measure has a definition, source, owner, refresh time, and known gaps within one click.
  • Targets are shown as references, and any status color follows a stated rule that allows for variation.
  • Decoration that adds no information has been removed.

Trust and operation

  • The charter has been agreed, and individual-level views are off (see topic 11.3, Rolling out metrics without breeding fear).
  • Teams have seen their own data and had time to correct it.
  • Data is pulled automatically, with freshness checks and reconciliation with the source (see topic 11.2, Tooling landscape).
  • A named owner, a review date, and a challenge route exist.
  • The reports this dashboard replaces have a retirement date.

Program audit checklist

Use this twice a year, with the teams, alongside the self-assessment (see topic 12.5, Maturity self-assessment).

Purpose and trust

  • The program has a sponsor and a written charter that leaders follow.
  • Reported breaches of the charter were handled and the outcomes published without names.
  • Team surveys and near-miss reports do not suggest rising fear.
  • No league tables of teams or individuals exist anywhere in the organization's tools or slides.

Measures and data

  • Each team can name the decisions its measures informed last quarter.
  • Definitions are kept in a portable catalog, with owners.
  • Source coverage, pipeline reliability, and reconciliation are checked and visible.
  • An export of definitions and history has been tested in the last year.

Balance and breadth

  • Outcome measures sit beside activity measures in each view.
  • AI-related measures follow baselines, sampling, and verified outcomes, not volume alone (see topic 10.4, Metric inflation and quality dilution).
  • Cost, risk, and people measures are present where they matter, and none are used to rank individuals.

Improvement

  • Improvement actions from the last review are completed or dropped with a reason.
  • Measures and reports were retired in the last year.
  • The effort asked of teams for measurement has been estimated and is acceptable to them.
  • The program itself has been reviewed with the teams, and the plan was changed as a result (see topic 11.5, An incremental adoption roadmap).