AI skills
agile-itil-metrics-maintainer-skill
Helps maintainers write and check Agile ITIL Metrics topics against the spec. Use when drafting, reviewing, or renaming a topic, or when running the quality gates.
- Read
spec/index.md,spec/topic-template.md, andspec/conventions.mdbefore editing. - Use the 20-section template in order. Every metric in the definitions table appears in the gaming vectors table with a guardrail.
- No em-dashes, no stock phrasing, no invented sources, figures, or URLs. Label illustrative numbers.
- Verify every Wikipedia link, and repeat it in the references.
- Run
bin/check --links. Fix every error before committing. - For structure changes, edit
spec/structure.mdandspec/topics.tsvtogether, then runbin/scaffoldandbin/build-readme.