Overview and motivation

Every other topic in this book ends with a small maturity table for its subject. This topic applies the same scale to the metrics program as a whole. The question is not how good a team's incident times are. It is how well the organization collects, reads, and acts on measures at all: whether definitions are shared, whether the data is trusted, whether the numbers lead to decisions, and whether the people measured see the program as help.

A maturity model is a description of stages that an organization may pass through as a practice develops. The best-known example in software is the Capability Maturity Model, which grew from work at the Software Engineering Institute and spread widely. Its influence was large, and so was the criticism that followed. Organizations chased the level and not the capability, auditors scored paperwork, and the model came to be used as a badge. A responsible use of any maturity model keeps three cautions in view. The scale is a conversation tool and not a certification. Higher is not always better, because the right level depends on context. And the model is no substitute for outcomes: a mature program that does not improve services is a very tidy failure, and a level shown as a badge is much like a vanity metric, a number that looks good and informs no decision.

The scale used here is the one shared across the book and the Agile ITIL Guide: Initiate, Develop, Standardize, Manage, and Orchestrate (see the shared maturity model in the specification). It is deliberately not the same as the process maturity scales in ITIL, in ISO/IEC 33000, or in the Capability Maturity Model, and a team should not claim a score in any of those frameworks on the strength of this one.

The agile aims point to how to use it. Continuous improvement means the model is for finding the next step, not for reaching a final state. Ongoing evolution means a program that reached Orchestrate last year may regress if people leave or priorities shift, so the self-assessment is repeated. Continuous stakeholder involvement means the assessment is done with the teams and not on them. A sustainable pace means the program takes one step at a time and does not try to leap three levels in a quarter. And building around motivated individuals means that the people doing the work judge whether the program helps them. This is the same logic as the continual improvement practice in ITIL, where an organization checks the current state, sets a direction, and improves in small steps, a habit close to kaizen, the Japanese idea of continuous improvement by everyone. The more general idea is the continual improvement process (see topic 9.5, Continual improvement metrics).

The model has a particular trap in the context of metrics. A program that is assessed on its own metrics invites the very distortion it warns against. If "number of measures with definitions" becomes a target, definitions multiply. The approach in this topic therefore uses evidence from the work (what decisions changed, what teams say) in addition to counts, and it keeps the assessment owned by the teams, who have the least to gain from inflating it (see topic 1.2, Goodhart's law and the psychology of metrics). A companion assessment form for teams appears in the appendices (see topic 12.5, Maturity self-assessment).

Key principles

  • The scale is a conversation tool. It helps people describe the present and choose a next step, and it is not for rating, ranking, or certifying.
  • Assess with the teams. Self-assessment, discussed openly, is more accurate than external scoring.
  • Judge by evidence. Ask what decisions changed, what people say, and what the data shows, as well as what documents exist.
  • Dimensions can differ. A program can be strong in tooling and weak in trust. Report the profile, not a single number.
  • Move one step at a time. Aim for the next level in one or two dimensions, not for everything at once.
  • Higher is not always better. Choose the level that fits the size, risk, and needs of the organization.
  • Expect regression. Staff turnover, reorganization, and pressure can push a program back. Reassess regularly.
  • Never publish a league table of teams. Aggregate for the program and share team results only with the team.

Metric definitions

The measures below describe the program's health and its assessment. They are for the program team and the sponsors, and they are read as signals for discussion.

Metric Definition Formula Unit Data source ITIL practice Agile counterpart Cadence
Assessment participation Share of participating teams that completed a self-assessment with their own discussion teams that completed and discussed / participating teams percent Assessment records Continual improvement Reflection and retrospectives Twice a year
Profile by dimension The distribution of teams' self-assessed levels in each dimension, shown as a range and not a single score count of teams at each level, per dimension teams per level Self-assessments, aggregated Continual improvement; governance Visible work Twice a year
Improvement actions from assessments Share of agreed next steps that were completed, dropped with a reason, or still under way actions closed or reasoned out / actions agreed percent Improvement register Continual improvement Small experiments Quarterly
Decision evidence Share of sampled measures where the team can name a decision or deliberate choice that the measure informed in the last quarter measures with a named decision / measures sampled percent Team interviews; review notes Continual improvement Evidence over ceremony Quarterly
Definition and data trust Team-level agreement that the definitions are clear and the data is correct percent agreeing on a short team survey; response rate shown percent Anonymous team survey Knowledge management; information management Shared understanding Twice a year
Time-to-next-level (descriptive) Elapsed time for a team to move a dimension up one level where it chose to median months from agreed step to the team's reassessment months Assessment history Continual improvement Sustainable pace Annual
Assessment burden Hours the assessment takes per team median hours per team hours Time estimates from teams Continual improvement Sustainable pace Twice a year

Participation is measured as completion with discussion, because a form filled alone says little. Profile is a range and is never averaged into one maturity number. Time-to-next-level is descriptive: a fast climb may reflect inflated self-scoring, and a slow one may reflect appropriate care. Assessment burden is a check on the assessment itself, which should take no more than an hour or two per team.

Recommendations

Use the scale well

1. Define the dimensions of a metrics program. A workable set has six dimensions: (a) questions and purpose, whether measures answer questions that audiences asked; (b) definitions and ownership, whether measures have written definitions and owners; (c) data and tooling, whether the data is accurate, timely, and portable; (d) use in decisions, whether numbers inform choices; (e) trust and safety, whether people believe the data helps them; and (f) review and evolution, whether the program trims itself. Six is enough to be useful and few enough to discuss in an hour.

2. Describe what each level looks like. The table in the "Maturity model" section below gives short descriptions for each dimension at each level. Treat them as prompts. A team should adapt the wording to its own context and write down its own examples.

3. Do not average. A single overall score hides the pattern that matters. A program with high tooling maturity and low trust is in a different situation from one with the reverse, and the next step differs. Show the profile.

Assess with and not on the teams

4. Make it a conversation of an hour. Bring a team together with the table. Ask each person to mark where they think the team is in each dimension, privately, and then compare. Discuss differences, because they reveal different experiences of the same program. Agree on a team view, record the evidence behind it, and choose one or two next steps.

5. Ask for evidence. For each level claimed, ask for an example. "We use the numbers in decisions" invites the question "Which decisions last quarter?" Use sampled measures and interviews to check. This respects people and keeps the assessment from drifting into wishful thinking.

6. Keep the results with the team. A team's profile belongs to the team. The program shares aggregated ranges and common themes, and not a ranking. Make clear that the assessment does not affect funding, standing, or reviews. If it does, teams will inflate it and the value is lost (see topic 11.3, Rolling out metrics without breeding fear).

Choose next steps

7. Pick the dimension that limits the others. Trust and safety often limits everything else: without it, data is distorted and decisions are suspect. Definitions and ownership often limit data and use. A common pattern is to strengthen trust and definitions first, then data, then use and review. Look for the dimension where a small improvement would unlock the others.

8. Set a small, concrete step. A next step should be one a team can complete in a quarter and recognize: "agree a charter," "write definitions for our four measures," "automate two feeds," "hold a monthly review where we record decisions." Avoid steps such as "reach Level 4." Levels describe a state, and steps describe work.

9. Link steps to the improvement register. Put the actions in the same place as other improvement work, with owners and dates, and review progress in the regular improvement conversation (see topic 9.5, Continual improvement metrics). A step that is not funded or scheduled will not happen.

Keep it honest and light

10. Calibrate across teams without ranking them. Hold a short session where teams share examples of what they call Level 3 in a dimension. Discuss differences in standards. The aim is a shared understanding, not equal scores. Rotate the facilitator, and invite a team from outside the program to challenge the wording.

11. Reassess on a rhythm, and in response to events. Twice a year is enough for most programs. Reassess after a reorganization, a tool change, or a breach of the charter, since these can move trust in either direction. Watch for regression and treat it as information, not failure.

12. Retire or revise the model itself. Every year, ask the teams whether the dimensions and level descriptions still fit. Reword what confuses, and remove what no one uses. A model that has not changed in five years may be describing a program that no longer exists.

Gaming vectors and guardrails

Metric How it gets gamed Paired guardrail metric or practice
Assessment participation Completing forms to meet a quota; one person filling for the team Require a team discussion; ask for the evidence behind each claim
Profile by dimension Inflating levels to look good; sandbagging to receive help Do not link to funding or standing; ask for evidence; calibrate openly
Improvement actions from assessments Choosing trivial steps to close; closing without doing Review step size and value; check outcomes at the next assessment
Decision evidence Inventing decisions after the fact; listing decisions of no consequence Ask for the date and the people involved; accept "chose to do nothing" as a decision
Definition and data trust Coaching respondents; low response hiding discontent Anonymity and minimum group size; show response rates; talk with teams directly
Time-to-next-level (descriptive) Rushing claims of progress; hiding regression Keep descriptive; read with evidence; record regressions without penalty
Assessment burden Skipping the discussion to cut hours Track hours together with participation and the quality of evidence

A healthy reading shows a profile with a mix of levels, with trust and definitions rising before tooling and polish, next steps that are small and finished, decisions that teams can name, and an honest record of occasional regression.

Trade-offs: pros and cons

Approach Strength Weakness
Team self-assessment Honest, owned, quick Subjective; calibration needed
External assessment Consistent; independent Costly; invites performing for the assessor
Single overall score Easy to communicate Hides the pattern; invites targets
Profile by dimension Shows where to act Harder to summarize
Annual assessment Light Slow to notice regression
Twice-yearly with event triggers Responsive More effort
Linked to funding Gains attention Inflation and gaming
Kept separate from funding Honest data Needs other ways to gain support

The prose answer is to run a light self-assessment with evidence, report profiles and ranges, keep results with the teams, and tie next steps to the improvement register, not to funding or standing.

Questions to discuss with your team

1. Which of the six dimensions would we say is our weakest, and what makes us say so? Have each person pick one privately and then share. The facilitator should ask for a recent example. Look for patterns, and agree which dimension limits the others.

2. Can we name a decision from last quarter that a measure changed? List them. If the list is short, ask why. Discuss whether the problem is the measures, the data, or the habit of looking.

3. Where would we place ourselves on trust and safety, and how do we know? Look at near-miss reports, challenges, and survey results. Compare with how people talk in practice. Agree one thing leaders could do to move it.

4. What would a small, concrete next step look like for our weakest dimension? Draft it in one sentence, with an owner and a date. Check that it can be finished in a quarter. Agree how we will know it worked.

5. What would make this assessment feel like a threat, and how do we prevent it? Discuss uses of the results that people would fear. Write down what the results will never be used for. Check that the program lead agrees.

6. Is there a level we do not need to reach? Think about our size, risks, and goals. Describe a level that is good enough for now and a signal that would tell us to revisit.

Four perspectives

Product and delivery teams

Teams assess themselves, choose the next step, and keep their results. They should use the conversation to surface differences in experience, ask for evidence, and set steps small enough to finish. They should push back on any attempt to turn the profile into a ranking.

Service and operations teams

Operations teams carry heavy data and incident loads and can see where the program supports them or burdens them. They should note where tooling or definitions block their work, ask that on-call and incident data be handled with care, and give frank feedback on the assessment burden.

Leadership and governance

Leaders sponsor the program and receive the aggregate picture. They should ask for profiles and common themes, resist asking for a single score, fund the next steps that teams choose, and not tie funding or standing to the assessment. They should also model the behavior by describing decisions that metrics informed.

Customers and users

Customers and users benefit when the program improves services and when their feedback is part of the measures. Where they are partners, they can take part in assessing measures that concern them, for example the usefulness of satisfaction surveys, and in reviewing how their data is used.

In practice: an agile ITIL example

A national insurance group has 20 delivery and support teams and a metrics program that has run for 18 months. The sponsor asks for "a maturity score for each team" to guide investment. The program lead is wary, remembering how a previous audit-style scoring led teams to prepare binders of documents. The figures below are illustrative.

The program lead proposes instead a profile across six dimensions, assessed by teams in an hour-long conversation with a facilitator from outside the team, with results kept by the team. She tells the sponsor that the program will report ranges and common themes, and that no team's profile will be linked to funding. The sponsor agrees, and the decision is recorded.

Nineteen of 20 teams complete the assessment with a discussion, so participation is 95 percent. The profile shows a range: in questions and purpose, most teams sit at Level 2 or 3; in definitions and ownership, a spread from 1 to 4; in data and tooling, mostly 3; in use in decisions, mostly 2; in trust and safety, a split between 2 and 4; and in review and evolution, mostly 1 or 2. The evidence checks are revealing. Eleven teams claimed Level 3 for use in decisions, but when asked to name a decision from the last quarter that a measure informed, only six could. The program lead notes this without judgment, and it becomes a theme: the teams have dashboards and rarely hold reviews that record decisions.

The next steps are small. Eight teams choose a monthly review with a decision log. Four choose to write definitions for their measures. Three choose to agree a charter. Six months later, 14 of 17 agreed steps are done, one is dropped with a reason, and two are under way. A repeat assessment shows decision evidence rising from 38 percent to 71 percent of sampled measures, and the trust survey moving from 54 to 67 percent agreement. One team slips back in trust after a reorganization, and the facilitator records it as information, not failure. A year later the sponsor asks again for a single score for the annual report. The program lead offers a one-page profile with ranges, three themes, and the improvement steps completed. The sponsor accepts, and the report states plainly that the scale is a conversation tool.

Sector lens

Startup. A formal assessment is likely excessive. A short conversation twice a year over the six dimensions, with one or two small steps, is enough. Watch for the fear that measures will be used for judgment, since small teams feel this keenly.

Small business. Use the dimensions as a checklist for a talk with the owner and staff. Ask whether the few measures you keep answer real questions, whether people know what they mean, and whether they are used. Pick one step. Do not spend more than an hour.

Enterprise. Scale needs a light, consistent process: the same dimensions, self-assessment with a facilitator, calibration sessions, and aggregated profiles. Resist a central scoring office. Link next steps to improvement registers, and report ranges and themes to sponsors. Guard against the scale turning into a compliance exercise.

Government and public sector. Audit and oversight bodies may ask for maturity scores. Be clear about the difference between this internal conversation tool and any formal framework. Keep team results with the teams, provide aggregates to oversight, and be transparent about what the scale is and is not (see topic 8.3, Compliance and audit metrics).

Business case: motivations, ROI, and TCO

The costs are small: an hour or two per team twice a year, a facilitator, some analysis, and the effort to carry out the improvement steps. The larger costs come when the model is misused, with consultants, scoring offices, and binders of evidence.

The returns come from better targeting of effort. Instead of spreading investment across all dimensions, the program finds the limiting dimension and addresses it. Other returns include earlier recognition of regression, shared language between teams, and improvement steps that teams chose and own. Build the case from your own data: improvement steps completed, changes in decision evidence and trust survey results, and the effort the assessment took. Avoid quoting published claims about the returns of maturity improvement without a traceable source and relevance to your context (see topic 7.7, Return on investment and business case).

Anti-patterns and pitfalls

  • The maturity badge. The level becomes the goal. Use it as a conversation, with evidence.
  • One overall number. The pattern is lost and targets appear. Show the profile.
  • Scoring by auditors. Teams prepare documents to perform. Use self-assessment with a facilitator.
  • Linking the score to funding. Inflation follows. Keep the assessment separate.
  • Chasing the top level. Not every program needs Orchestrate. Pick what fits.
  • Assess and forget. No steps follow. Link steps to the improvement register.
  • Overlong assessment. Burden grows and quality falls. Keep it to an hour.
  • Ignoring regression. Programs slip after change. Reassess on a rhythm and after events.

Maturity model

Dimension 1 Initiate 2 Develop 3 Standardize 4 Manage 5 Orchestrate
Questions and purpose Measures collected because data exists Some teams state the questions they ask Audiences and questions written down; measures mapped to them Question coverage reviewed; unanswered questions drive new measures Audiences, including customers and suppliers, shape the measures; questions evolve with the services
Definitions and ownership Definitions vary by person Some written; informal owners Catalog with definition, source, owner, and limits for each measure Definition completeness and challenges managed Definitions co-owned across teams and suppliers; revised when they stop informing decisions
Data and tooling Manual and fragile Some automated feeds Tested pipelines, shared store, portable data Reliability, reconciliation, and exit readiness managed Federated pipelines with shared contracts; sources improved from feedback
Use in decisions Numbers displayed, rarely used Used in some reviews Regular reviews that record decisions Decision evidence tracked and acted on Decisions linked across teams to outcomes; learning shared
Trust and safety Fear or indifference Verbal assurances Written charter; individual views off; safety survey Breaches reviewed in the open; candor signals managed Trust routine; program shaped by staff and partners
Review and evolution None Occasional clean-up Periodic review with teams; retirement rule Assessment steps funded and completed Program improves continually, with changes from everyone

Checklist

  • The six dimensions are agreed, and the level descriptions are adapted to our context.
  • Each team assesses itself in a discussion of about an hour, with a facilitator.
  • Each claimed level is backed by an example or a sampled check.
  • Results are shown as profiles and ranges, and never as one averaged score or a ranking.
  • A team's results stay with the team, and the aggregate is shared with sponsors.
  • The assessment is not linked to funding, standing, or performance reviews, and this is written down.
  • Each team agrees one or two small next steps, with an owner and a date.
  • Next steps are tracked in the improvement register.
  • Reassessment happens at least twice a year and after major events.
  • The model itself is reviewed yearly with the teams.

AI prompts

Prepare a self-assessment conversation.

Prepare a one-hour facilitation plan for a team's self-assessment of its metrics
program across six dimensions: questions and purpose, definitions and ownership,
data and tooling, use in decisions, trust and safety, and review and evolution.
Use five levels: Initiate, Develop, Standardize, Manage, Orchestrate. Include
private marking, comparison, evidence questions, and agreeing one or two small
next steps. Do not produce a score. List your assumptions.

Turn a weak dimension into steps.

Our team rates itself at Level [n] on [dimension] of its metrics program. Evidence:
[paste]. Suggest three small steps, each finishable in one quarter, that could move
us toward Level [n+1]. For each step, describe the owner, the effort, the likely
benefit, and how we would know it worked. Do not promise outcomes. List your
assumptions and risks.

Check evidence for a claimed level.

A team claims Level [n] on [dimension] and gives this evidence: [paste]. Act as a
curious colleague. List questions to test whether the evidence supports the claim,
what examples would be convincing, and what signs would suggest the claim is
optimistic. Do not judge the team. List your assumptions.

Summarize profiles without ranking.

Here are aggregated counts of teams at each level for each dimension: [paste]. Write
a half-page summary for sponsors that describes the range, three common themes, and
the improvement steps teams chose. Do not rank teams, produce a single score, or
claim causes without evidence. List caveats about self-assessment.

AI skills

Key takeaways

  • Use the shared five-level scale as a conversation tool, never as a badge, ranking, or certification.
  • Report a profile across six dimensions and not one averaged score.
  • Assess with the teams, ask for evidence, and keep each team's results with the team.
  • Choose small next steps in the dimension that limits the others, often trust and definitions.
  • Track steps in the improvement register, and reassess regularly because programs regress.
  • Higher is not always better, and outcomes matter more than levels.

References and further reading

  1. Paulk, M., et al., Capability Maturity Model for Software, Version 1.1, Software Engineering Institute, Carnegie Mellon University, 1993.
  2. Axelos, ITIL 4: Direct, Plan and Improve, 2020.
  3. ISO/IEC 33001, Information technology: Process assessment: Concepts and terminology, International Organization for Standardization, 2015.
  4. Imai, M., Kaizen: The Key to Japan's Competitive Success, McGraw-Hill, 1986.
  5. Muller, J., The Tyranny of Metrics, Princeton University Press, 2018.
  6. Beck, K., et al., Principles behind the Agile Manifesto, 2001, https://agilemanifesto.org/principles.html.
  7. Wikipedia, Capability Maturity Model.
  8. Wikipedia, Kaizen.
  9. Wikipedia, Continual improvement process.
  10. Wikipedia, Goodhart's law.
  11. Wikipedia, Vanity metric.